Steve said:
The plan is to go to FDIS ballot on 13250 Part 3 early enough that we
have the result in time for the next meeting of WG3, which takes place =
in
Seoul, Korea on May 29-June 1 2006.
This has been our working assumption, that we could finish an FDIS =
ballot and
immediately meet to resolve the comments and so finish the process.
=20
We may have a problem. In looking at processing the FDIS on the OASIS =
ODF,
Ken reread the JTC1 Directives and found that we may have been violating =
the
rules. He posed the question to Lisa Rajchel, the JTC1 Secretariat, and =
she
replied:
Ken,
You are correct in that the Directives require a minimum of 2.5
months between the release of the voting results and the beginning of a =
BRM.=20
Ken is now looking at doing the BRM for ODF in Montreal.=20
=20
WG3 should check its schedule with Ken.
=20
=20
Jim Mason
=20
------_=_NextPart_001_01C62C24.336FBA2C
Content-Type: text/html;
charset=us-ascii
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD><TITLE></TITLE>
<META http-equiv=3DContent-Type content=3D"text/html; =
charset=3Dus-ascii">
<META content=3D"MSHTML 6.00.2900.2802" name=3DGENERATOR></HEAD>
<BODY>
<DIV><!-- Converted from text/plain format --><FONT face=3DArial =
color=3D#0000ff=20
size=3D2>Steve said:</FONT></DIV>
<BLOCKQUOTE dir=3Dltr style=3D"MARGIN-RIGHT: 0px">
<DIV><FONT face=3DArial size=3D2>
<P>The plan is to go to FDIS ballot on 13250 Part 3 early enough that =
we have=20
the result in time for the next meeting of WG3, which takes place in =
Seoul,=20
Korea on May 29-June 1 2006.</P></FONT></DIV></BLOCKQUOTE>
<DIV><FONT face=3DArial color=3D#0000ff size=3D2>This has been our =
working assumption,=20
that we could finish an FDIS ballot and immediately meet to resolve the =
comments=20
and so finish the process.</FONT></DIV>
<DIV><FONT face=3DArial color=3D#0000ff size=3D2> </FONT></DIV>
<DIV><FONT face=3DArial color=3D#0000ff size=3D2>We may have a problem. =
In looking at=20
processing the FDIS on the OASIS ODF, Ken reread the JTC1 Directives and =
found=20
that we may have been violating the rules. He posed the question to Lisa =
Rajchel, the JTC1 Secretariat, and she replied:</FONT></DIV>
<BLOCKQUOTE dir=3Dltr style=3D"MARGIN-RIGHT: 0px">
<DIV><FONT face=3DArial color=3D#0000ff size=3D2><FONT size=3D2>
<P><FONT color=3D#000000>Ken,</FONT></P>
<P><FONT color=3D#000000>You are correct in that the Directives =
require a=20
minimum of 2.5 months between the release of the voting results and =
the=20
beginning of a BRM. </FONT></P></FONT></FONT></DIV></BLOCKQUOTE>
<DIV><FONT face=3DArial color=3D#0000ff size=3D2>Ken is now looking at =
doing the BRM=20
for ODF in Montreal. </FONT></DIV>
<DIV><FONT face=3DArial color=3D#0000ff size=3D2></FONT> </DIV>
<DIV><FONT face=3DArial color=3D#0000ff size=3D2>WG3 should check its =
schedule with=20
Ken.</FONT></DIV>
<DIV><FONT face=3DArial color=3D#0000ff size=3D2></FONT> </DIV>
<DIV><FONT face=3DArial color=3D#0000ff size=3D2></FONT> </DIV>
<DIV><FONT face=3DArial color=3D#0000ff size=3D2>Jim Mason</FONT></DIV>
<DIV><FONT face=3DArial color=3D#0000ff =
size=3D2></FONT> </DIV></BODY></HTML>
------_=_NextPart_001_01C62C24.336FBA2C--